Secondary education (after installation): applicant after receiving basic training artificial stone cement Plast technology and other technologies as well as booklets provided training formula, are obliged to supply the raw materials required, the form of artificial stone cement Plast, and equipment manufacturing and according to the situation and coordinate relevant matter to the researcher has announced. Secondary education is for to days and in the realization of practical technology provided to the applicant
- But the volumetric mass is between and kg per cubic meter of synthetic stones that are ultra-light. But due to the use of certain materials in this type of product, the water absorption will be up to % (albeit by default and without the use of side materials), which are suggested for interior decoration. Unless they are added during the production of the relevant nanoscale material to reduce the water absorption of the outside of the building.
The touch screen of this production line is as -inch automatic as: Power and control panel of the central controller of the machine and equipment, with the motherboard to control and command all machines with their respective monitors, with a reporting capability of times the previous production - Equipped with a monitor -inch color touchscreen - Schneider electric appliances in Germany and Telecom France and Delta - with new programming
Two-piece vibrating hopper has a custom-made vibrator for removing aggregate and substitute materials, as well as for raw materials for powder and pastry tile adhesives with a kg three-phase electromotor. Special variations: Two-piece hopper part due to the simultaneous loading of two different inorganic materials A mm reinforced sheet is provided. Two-speed chainsaw with two-part chainsaw with two separate / horses and two in-line / horses
Secondary education (after installation): applicant after receiving basic training artificial stone cement Plast technology and other technologies as well as booklets provided training formula, are obliged to supply the raw materials required, the form of artificial stone cement Plast, and equipment manufacturing and according to the situation and coordinate relevant matter to the researcher has announced. Secondary education is for to days and in the realization of practical technology provided to the applicant