Rather than a square tunnel through the building, the gateway is conceived as a smooth transition from one façade to the other, turning the surface of the museum inside out. In the direction of the bridge, the building will consist of a procession of parallel concrete frames that change in scale, from generous to intimate as you pass through. Similarly, the species of trees will range from big to bonsai and back again. The façade will seem to cave in like a loophole from front to back. Viewed from the front, the building is opaque and enigmatic. As people pass through, it turns out to be an entirely transparent space with works of art in all directions. The passageway becomes a promenade through an art archive. The building’s insides will be exposed on the outside, and its main façade will
Due to the unique character of Singapore’s urbanism both very dense and verdant BIG pursued the design challenge as a vertical exploration of tropical urbanism, reinforcing Singapore’s reputation as a garden city. The building’s recognizable exterior façade consists of vertical elements that are pulled apart to allow glimpses into the green oases blooming from the base, core and rooftop. A dynamic interplay of orthogonal lines and lush greenery presents itself in the contrasting textures of steel and glass, interweaved with tropical vegetation.
Located in Copenhagen’s Nordhavn neighborhood, BIG’s new HQ building recently topped out its -storey structure. The new HQ is architecturally anchored in Copenhagen harbor’s heritage of warehouses and factories. The small footprint at the end of the pier became the main design dilemma: how to organize a single work environment for all of us when we would have to be split between a minimum of four levels. In a counterintuitive decision, we split all the floors in half and doubled the amount of levels.
A technical study has been undertaken to determine and address the nature of any conflicts with existing infrastructure and landowners. In February of , owing to this pro-bono BQP effort, the NYC Department of Transportation officially shelved previous plans, and an official New York City Council study endorsed the BQP approach, with City Council Speaker Corey Johnson stating “This is something we’re going to live with for the next years. Let’s make sure we do it right”. Work is now set to begin on establishing a governance structure to take the project forward.
The first stages of project development at BIG always involve a careful study of the site and the programmatic requirements. In the case of the Escher Tower, the site was an orthogonal intersection of an east-west highway and a north-south subway line, populated by a department store and a medical business. The program was identical hotel rooms with the only interesting activities to be placed in a single floor at the ground.