During the summer, the inclined roof surface of the winter bath functions as an amphitheater facing the pools as well as the park, increasing the connection between the bath and Islands Brygge. Throughout the winter the active zone is mainly under the lifted deck, where the winter bath facilities are placed facing southwest. During the dark months, the winter bath brings life to the area and can be seen as a lantern from both Islands Brygge and Kalvebod Brygge.
Located in the visual axis of the Notre Dame Cathedral in a dense context of university buildings from different historical periods, BIG proposes a building geometry that adapts to the specific conditions of all adjoining sides, optimized for daylight, views and accessibility. The three-dimensional envelope retracts from the neighboring facades, opens up towards the square of Institut du Monde Arabe and the park, and folds into a publicly accessible rooftop landscape, resulting in an adapted sculptural building volume.
The top of the building is crowned by the Masterpiece Gallery, a collection of LEGO fans’ beloved creations that pay tribute to the LEGO community. The Masterpiece Gallery is made of the iconic × LEGO brick and showcases art beneath eight circular skylights that resemble the studs of the brick. Like the golden ratio, the proportions of the brick are nested in the geometries of everything man-made in the building, from the glazed ceramic tiles in the steps and walls to the overall block scheme. Atop the Masterpiece Gallery, citizens and visitors can get a ° panoramic view of the city. Some of the rooftops can be accessed via pixelated public staircases that double as informal auditoria for people watching or seating for performances.
Maritime Youth House is located on the island of Amager, in Copenhagen. In , PLOT (BIG + JDS) was invited to design a new building for two user groups with different requirements: a sailing club that needed most of the site to moor their boats and a youth center that wanted outdoor space for the kids to play. The geotechnical report revealed pollution on the site with / of the building budget allocated to moving the topsoil from the site to a landfill.
The project includes the restoration of the Daily Express Building grade II* listed building. The headquarters of the newspaper once the epicenter of the newspaper industry and one of London’s finest Art Deco interiors will for the first time in its history be given a stand-alone status. The project will provide inclusive public access to the original art deco lobby, as well as the exterior roof amenities that include views of the surrounding city.