Since the infrastructure is the most important element, the rest of the program is integrated with it as much as possible. In order to create a physical interface, the elevated vacuum tube wraps around itself and descends as a gentle ramp, ending in an airlock that allows for save entry and exits for pods. While the pill shaped loop of the tube forms the exterior façade of the facility, the support structure gets extended towards the interior as a sequence of concrete frames with fileted corners for lateral support.
Double height spaces create a visual connection between the different programs. The structural approach consists of concrete slabs and timber framing supporting a roof that is draping across the site in peaks and valleys. The landscape around the building provides two larger open entry plazas and a series of outdoor studios spilling out from inside, creating a gradient between softscape and hardscape around the site.
The Coral is the cornerstone of the Albany Masterplan. Located at the southern tip of the public promenade, it has a unique relationship with the harbor entry and with the South West Bay beyond. It is one of the largest buildings in Albany with wraparound balconies offering spectacular, panoramic views from the marina to the ocean, and beyond. Different unit sizes introduce dynamic irregularities in the pattern, similar to the staggered elevation of The Honeycomb and The Cube. The rounded motif of the plan is repeated in elevation and creates a natural opening that exposes a dipping pool for every balcony at the demising wall of the units below. These unique pools have a transparent edge towards the marina and ocean, eliminating the visual barrier between the pool and the surrounding environment and allow bathers to become fully immersed in the view of the marina and the ocean beyond.
The site is bound by four key traffic corridors, the character of which informs the public space programming around the Philharmonic. Along the Western side, Bubenská passes the site and continues across the Vltava on the Hlávkův Bridge. Here, several modes of mobility are accommodated within the public realm. Along the North, the tram line runs adjacent to the new neighborhood development. As a car-free zone, this corridor becomes an important pedestrian and soft mobility connection to the surrounding neighborhoods. The new ecological corridor extending down from Stromovka Royal Game Reserve passes by the Eastern side of the site, creating a lush green buffer between the Philharmonic and the train line.
BIG HQ is BIG’s first example of fully integrated LEAP design – a collaboration between Landscape, Engineering, Architecture and Product designers. Everything from door handles to concrete columns – from urban design to glass facades has been given form by the BIG LEAP team. The building is designed to achieve the Danish sustainability certification, DGNB Gold, through use of FutureCem concrete, which reduces CO