The method of installing nano-cement foam plasters is similar to the installation of ceramic. That is, a dry mortar layer is spread over the surface of the cement, and it is sprinkled on it with a cement slurry, and we plan to install the floors and align them. By creating a cement slurry, the kidneys cover the pores under the product and the rest of the slurry emanates from the flooring joints. By cleaning it, the product is simultaneously bonded.
Offering a variety of machinery and equipment production line of artificial stone cement Plast (workshop artificial stone production line multi-functional), machinery and equipment for the production of stone antique artificial stone guillotine Artificial stone facade with any design, color and dimensions as smooth or with decorative, flooring and mosaic Antique nano-cement Plast, the stone stairs and under the stairs of artificial nano-features Roman columns and protections, stone arabesques and lattice facade of the building, inscriptions and paintings, stone, fences pots and urban furniture and construction elements, with different technologies education and with the ability to manufacture artificial stone cement Plast The construction adhesives without the need for other equipment | for producing various kinds of adhesives dry stone tile and adhesive facade adhesive swimming pools, sticky clay tile and stone powder jointing color and anti-bacterial, mortar repair and restoration plasters, Concrete and waterproofing glue
علاوه بر خط تولید دستی سنگ مرمر - گرانیت مصنوعی ، شرکت سنگ مصنوعی هونام قادر به ارائه انواع خط تولید سنگ مهندسی مصنوعی مرمر و گرانیت بصورت اتوماسیون ، نیمه اتوماتیک و کاملا اتوماتیک می باشد : cultured marble artificial stone production line - automation & semi automatic and automatic
* Note: Some companies have introduced a very low loading and gradient loading system, as well as a low-volume hopper profile to reduce the amount of sheet consumed, the production of a rail system with very poor spectacle characteristics and low maintenance without preserving , The lack of use of the gearbox at the top and cost for the horizontal space of the upper part and the installation of the engine in the bottom of the rail system, loading solids and .... In this case, some of the solids will not enter into the mixer when it falls into the mixer, and it will not be fully loaded, and will slow down due to the poor profile of the rails. The loaded angle should be between and degrees in the rail system. For example, in order to load at a height of meters, the mixer should have an angle of meters and should be used with a heavy -stroke
Secondary education (after installation): applicant after receiving basic training artificial stone cement Plast technology and other technologies as well as booklets provided training formula, are obliged to supply the raw materials required, the form of artificial stone cement Plast, and equipment manufacturing and according to the situation and coordinate relevant matter to the researcher has announced. Secondary education is for to days and in the realization of practical technology provided to the applicant