Running a successful petroleum operation requires a blend of technology, business savvy, and people skills. If you already have a firm grasp of exploration or production technology, learn to amplify its effectiveness with applied project management techniques. This course is aimed at helping technical personnel make the best business decisions that lead to lowest project cost while still meeting all production or exploration goals. This course covers the principles and application of project management to the upstream oil and gas business.
This course describes the deepwater technology that has been developed and implemented in the last few years. Each of the DW system components is discussed in terms of its engineering challenges. Introducing each technology area is a brief description of the conventional water depth technology from which the new, DW concepts have evolved. The basis for selection of particular field configurations are discussed.
يقع الفندق في الجزء الخلفي من النهر Rock Motel، المطعم الغربي جدا مع مناظر جميلة. قائمة الطعام صغيرة نوعا ما بالنسبة لنا. لقد كان سمك السلمون المرقط تناولت أنا وزوجتي. نحن جيد ولكنه غالي الثمن. لا يوجد الكثير من المطاعم في المنطقة للاختيار من بينها...
After completing this course participants will be able to place the drill string design process in context with other planning and operational considerations; Design cost-effective BHAs; Gain specific application experience analyzing common load cases for both near-vertical and high-angle situations: Tension loads, Torque loads, Combined tension-torque loads, Fatigue loads, Buckling loads; Identify drilling tools and operational practices to reduce both torque and drag and casing wear; refresh underlying physics of drill string failures and mechanical properties of drill string materials; diagnose and mitigate vibration to reduce drill string damage and failure; optimize drill string inspection program using the latest industry standards.
Air Ventilator is Too Small / Air ventilator capacity doesn’t suit with work area – If air ventilator is too small, then air flow will not adequate to maintain safe atmosphere to workers. Size of air ventilator depends on the size of work area and the amount of air flow required for the job. Time at air replacement – Time for air replacement and volume must be define by a competent person such as engineer, because each confined space and activity requires different air flow