implementation consultation Winding In Islamshahr

Winding-1
Winding-2

Presentation of businesses
You can introduce your business services or products in this section.
For this purpose, be in touch with us.



The stator winding insulation in petrochemical plant motors and generators have been assessed using routine on-line partial discharge (PD) testing for at least years, starting in chemical plants in the US Gulf Coast. PD are small electrical sparks that can occur in the winding insulation system due to poor manufacturing of the stator winding; or due to aging of the stator. In online PD monitoring the PD current pulses are detected by either capacitive sensors or high frequency current transformers that are mounted in the motor terminal boxes. To ensure reliable results, attention must be paid to reducing the risk of false positive indications due to electrical noise.

For the alarm setting of the self-winding machine, the system software can start the alarm according to the set alarm level. Also, depending on the level, various alarm shutdown methods are used to disconnect the automated inspection system, but if the main parameter setting is disconnected and a shutdown is required, the system software will stop the winding and the operator will Also decide whether to do it. For standard pneumatic tests, the system software sets up the original standard pneumatic test. If the working pressure is lower than the preset value, the system software will stop running and start rewinding after the standard air pressure responds.

شرکت تسلا پیشرو متشکل از فارغ التحصیلان و اساتید با تجربه دانشگاه صنعت آب و برق و دانشگاه علم وصنعت در سال آغاز به کار کرد. درسال موفق به اخذ مجوز است.قرار در مرکز توسعه فن آوری صنعت برق در پژوهشگاه نیرو گردید. محور فعالیت‌های شرکت تسلا پیشرو، ساخت تجهیزات و خدمات تست دقیق در صنعت برق و انرژی می‌باشد.



( implementation consultation ) `s other