implementation consultation Renovation and reconstruction of the building In Parand

Renovation and reconstruction of the building-1
Renovation and reconstruction of the building-2

Presentation of businesses
You can introduce your business services or products in this section.
For this purpose, be in touch with us.



The materials, their color and texture in each space, was selected according to the nature of the space. Our goal in designing the prayer hall was simplicity and purity in all its components, so that the main focus is on the direction of the Qibla and the position of the Mihrab. The combination of blue and white in the prayer hall, provides a relaxing environment for prayers, during contemplation and daily worship. Also, the separation of this two colors with its pleasant contrast in the vicinity of the Mihrab, and the use of rhythm and repetitive geometric pattern caused more focus on it. The extension of this pattern in the openings, and the planting of shrubs in the background, created a more lively atmosphere. The design of north wall encircling the Mihrab was completed with prominent verses, which done by masonry, in white color, and with a uniform texture. In the dining hall, deployment of wood and its combination on a white and gray background, has given a special warmth to the space, and has created an intimate environment for a friendly chat while eating. Finally, a green wall including shrubs and vines, was integrated continuously, with lattice scaffolding to a height of . meters, in the exterior of the building, and on the roof, to improve the view in all the walls with opening.

Renovating a home is a specialized job; And sometimes it&#;s even harder than building a new building. In fact, the building renovation contractor has to work more carefully and delicately and will deal with more restrictions. So imagine that you can do it in person; It is often out of the question. Vira Memari Company will explain all these things to you. All you have to do is contact us and ask us your questions so that we can give you the necessary guidance.

In the status quo, the prayer hall was located on north-end, and the dining hall was located on south-end. Considering the direction of Qibla and the access to prayer hall, resulted in a long undesirable corridor which occupied a large area. Also, the positioning of the dining hall on south-end which resulted in unfavorable views to the roof and mechanical facilities, and its distance from the dishwasher room also needed to be redesigned. Requirements such as two main accesses from the north and south to the roof, maintaining the required area for each space according to the design specifications, and access to the utility room, also imposed their restrictions. Therefore, the first step in design was the rearrangement of spaces: the spatial organization. By switching the locations of the prayer hall and dining hall, more suitable access to the prayer hall, and a more beautiful view towards the northern mountains of Tehran, was achieved in the dining hall. The entrance lobby, located next to the elevator, provided access to other spaces, with a more appropriate geometry, and a more favorable area. In the end, due to the spatial limitations, the toilet was placed in the middle of these two spaces, and adjacent to the prayer hall.



( implementation consultation ) `s other